Tuesday, 15th October 2019
Serve our customers in highly professional ways with the support of our principals

References

South Helwan Super Critical Power Plant 3X650 MW

Year: 2016

Principal: Cimtas

  • Supply and Supervision of erection of Critical Pipes and Valves

South Helwan Super Critical Power Plant 3 X 650 MW

Year: 2015

Principal: Shandong Power Equipment CO., LTD

  • Supply and Supervision of erection of Power Transformers

South Helwan Super Critical Power Plant 3 X 650 MW

Year: 2015

Principal: KSB

  • Supply and Supervision of erection of Power Block Main Pumps & Drives

South Helwan Super Critical Power Plant 3 X 650 MW

Year: 2015

Principal: KSB

  • Supply and Supervision of erection of Circulating & Service Water Pumps & Drives

Giza North 1500 MW Combined Cycle Power Project

Year: 2012

Principal: KSB

  • Supply and Supervision of erection of Feed Water and Condensate Water Pumps & Drives

Abu Qir Desalination 2X5000 M3 MED

Year: 2009

Principal: AquaTech

  • Supply, Installation & Supervision for Desalination Plant

Ain El Sokhna 2X650 MW Super Critical Steam Turbines

Year: 2009

Principal: Hitachi

  • Supply & Installation of Steam Turbine Condenser & Auxiliaries

El-Tebbin 2X350MW Thermal Power Plant

Year: 2008

Principal: KSB

  • Supply & supervision of erection of Boiler Feed Booster & Condensate Pumps

Cairo West 2X350MW Thermal Power Plant

Year: 2008

Principal: Cimtas Pipe

  • Supply the Critical Piping & Valves

ASEC – Al-Takamol Cement Co.

Year: 2008

Principal: MAN B&W

  • Supply of 5X8MW diesel engines in Berber - North Sudan

Sidi Krir & El-Atf 2X750MW Combined Cycle Power Plant

Year: 2008

Principal: Cimtas Pipe

  • Supply the Critical Piping & Valves

El-Tebbin 2X350MW Thermal Power Plant

Year: 2008

Principal: Cimtas Pipe

  • Supply the Critical Piping & Valves

El Kuriemat III 750MW Combined Cycle

Year: 2007

Principal: CMI

  • Supply & installation of HRSG’s & BOP.

Cairo West 2x350MW Power Station.

Year: 2007

Principal: Hitachi

  • Supply & installation of boilers & BOP

El Kuriemat II 750MW Combined Cycle

Year: 2006

Principal: CMI

  • Supply & installation of HRSG’s & BOP.

Sidi Krir/Cairo – 500KV Transmission Line

Year: 2005

Principal: Sumitomo / Fujikura

  • New 500 KV Transmission Line Sidi Krir – Nubaria – C500.
  • Project Financed by JIBIC.
  • Project in final approval stage by EETC & JIBIC.

El Kuriemat Combined Cycle Steam Turbine 750MW

Year: 2005

Principal: Sumitomo / Hitachi

  • Sumitomo/Hitachi have been evaluated as lowest bidder and invited to contract negotiations.
  • Project Financed by European International Bank.

Siwa Auxiliaries

Year: 2004

Principal: MAN Diesel & Turbo

  • Supply and commissioning of new auxiliaries for 1X2.5 MW MAN diesel engine relocated from Nuwaiba to Siwa

West Delta Regional Control Center

Year: 2004

Principal: Alstom

  • SCADA System for 220 & 66 KV network for the West Delta Region.
  • Turnkey Project including Control Building.

El Nubaria Miscellaneous Pumps

Year: 2004

Principal: KSB

  • Supply of Miscellaneous Pumps and Drives for El Nubaria Power Station 2X750 MW.

West Delta Communication System

Year: 2004

Principal: Alcatel

  • Complete fiber optic system including cables & terminal equipment to support the SCADA system for the region.

El Nubaria 500KV Switchyard

Year: 2003

Principal: Hitachi

  • Turnkey 500KV Switchyard including 220/500 KV transformers.

Cairo North Combined Cycle

Year: 2002

Principal: Hitachi

  • Steam Turbine, 360 MW including condenser & erection.
  • Main Step Up Transformers, Generator Breakers & Isolated Phase Bus Duct.

Cairo North Combined Cycle

Year: 2002

Principal: KSB

  • Supply of main pumps & drives for Cairo North combined cycle project funded by EIB.