South Helwan Super Critical Power Plant 3X650 MW
Year: 2016
Principal: Cimtas
- Supply and Supervision of erection of Critical Pipes and Valves
South Helwan Super Critical Power Plant 3 X 650 MW
Year: 2015
Principal: Shandong Power Equipment CO., LTD
- Supply and Supervision of erection of Power Transformers
South Helwan Super Critical Power Plant 3 X 650 MW
Year: 2015
Principal: KSB
- Supply and Supervision of erection of Power Block Main Pumps & Drives
South Helwan Super Critical Power Plant 3 X 650 MW
Year: 2015
Principal: KSB
- Supply and Supervision of erection of Circulating & Service Water Pumps & Drives
Giza North 1500 MW Combined Cycle Power Project
Year: 2012
Principal: KSB
- Supply and Supervision of erection of Feed Water and Condensate Water Pumps & Drives
Abu Qir Desalination 2X5000 M3 MED
Year: 2009
Principal: AquaTech
- Supply, Installation & Supervision for Desalination Plant
Ain El Sokhna 2X650 MW Super Critical Steam Turbines
Year: 2009
Principal: Hitachi
- Supply & Installation of Steam Turbine Condenser & Auxiliaries
Sidi Krir & El-Atf 2X750MW Combined Cycle Power Plant
Year: 2008
Principal: Cimtas Pipe
- Supply the Critical Piping & Valves
El-Tebbin 2X350MW Thermal Power Plant
Year: 2008
Principal: KSB
- Supply & supervision of erection of Boiler Feed Booster & Condensate Pumps
ASEC – Al-Takamol Cement Co.
Year: 2008
Principal: MAN B&W
- Supply of 5X8MW diesel engines in Berber - North Sudan
El-Tebbin 2X350MW Thermal Power Plant
Year: 2008
Principal: Cimtas Pipe
- Supply the Critical Piping & Valves
Cairo West 2X350MW Thermal Power Plant
Year: 2008
Principal: Cimtas Pipe
- Supply the Critical Piping & Valves
Cairo West 2x350MW Power Station.
Year: 2007
Principal: Hitachi
- Supply & installation of boilers & BOP
El Kuriemat III 750MW Combined Cycle
Year: 2007
Principal: CMI
- Supply & installation of HRSG’s & BOP.
El Kuriemat II 750MW Combined Cycle
Year: 2006
Principal: CMI
- Supply & installation of HRSG’s & BOP.
El Kuriemat Combined Cycle Steam Turbine 750MW
Year: 2005
Principal: Sumitomo / Hitachi
- Sumitomo/Hitachi have been evaluated as lowest bidder and invited to contract negotiations.
- Project Financed by European International Bank.
Sidi Krir/Cairo – 500KV Transmission Line
Year: 2005
Principal: Sumitomo / Fujikura
- New 500 KV Transmission Line Sidi Krir – Nubaria – C500.
- Project Financed by JIBIC.
- Project in final approval stage by EETC & JIBIC.
El Nubaria Miscellaneous Pumps
Year: 2004
Principal: KSB
- Supply of Miscellaneous Pumps and Drives for El Nubaria Power Station 2X750 MW.
West Delta Regional Control Center
Year: 2004
Principal: Alstom
- SCADA System for 220 & 66 KV network for the West Delta Region.
- Turnkey Project including Control Building.
Siwa Auxiliaries
Year: 2004
Principal: MAN Diesel & Turbo
- Supply and commissioning of new auxiliaries for 1X2.5 MW MAN diesel engine relocated from Nuwaiba to Siwa
West Delta Communication System
Year: 2004
Principal: Alcatel
- Complete fiber optic system including cables & terminal equipment to support the SCADA system for the region.
El Nubaria 500KV Switchyard
Year: 2003
Principal: Hitachi
- Turnkey 500KV Switchyard including 220/500 KV transformers.
Cairo North Combined Cycle
Year: 2002
Principal: KSB
- Supply of main pumps & drives for Cairo North combined cycle project funded by EIB.
Cairo North Combined Cycle
Year: 2002
Principal: Hitachi
- Steam Turbine, 360 MW including condenser & erection.
- Main Step Up Transformers, Generator Breakers & Isolated Phase Bus Duct.